Meadowlark Phase One Final Design
This work includes: site preparation, construction fencing, temporary soil erosion sediment control measures, site removals and clearing, earthwork, excavation, and grading, stormwater utilities, electrical service utilities and lighting, cast-in-place concrete foundations and footings, open-air shelter, playground & adven-ture course equipment on engineered wood fiber surfacing, site furnishings, as-phalt paving (pedestrian and vehicular), concrete paving, bean bag toss, trees, shrubs, low plant material, and native and turf seeding.
Bid Set - Specifications
(click to expand/collapse)
Name | Size | ||
Meadowlark Park Project Manual | 72.0 MB |
Invitation to Bid
(click to expand/collapse)
Name | Size | ||
24-29P - Meadowlark Development | 142.1 KB |