Meadowlark Phase One Final Design
This work includes: site preparation, construction fencing, temporary soil erosion sediment control measures, site removals and clearing, earthwork, excavation, and grading, stormwater utilities, electrical service utilities and lighting, cast-in-place concrete foundations and footings, open-air shelter, playground & adven-ture course equipment on engineered wood fiber surfacing, site furnishings, as-phalt paving (pedestrian and vehicular), concrete paving, bean bag toss, trees, shrubs, low plant material, and native and turf seeding.
Plan Holders
Date | Company | Contact |
2/15/24 2:32 pm |
Copenhaver Construction, Inc.
75 Koppie Drive Gilberts, IL 60136 |
Livia Nelson
Estimating Coordinator
Tel: 847-428-6696
Fax: 847-627-0080
|
2/19/24 10:07 am |
D & J Landscape Inc.
22803 W. Renwick Rd. Plainfield, IL 60544 |
Lorena Davalos
Tel: 815-254-3000
|
2/16/24 2:28 pm |
Hacienda Landscaping Inc
17840 Grove Rd. Minooka, IL 60447 |
Dinora Lara
Secretary
Tel: 8157826493
Fax: 815-782-6495
|
2/16/24 1:06 pm |
Innovation Landscape Inc
pox 505 Plainfield, IL 60544 |
Nataly Perez
Tel: 815-557-0473
Fax: 815-327-3689
|