Meadowlark Phase One Final Design

This work includes: site preparation, construction fencing, temporary soil erosion sediment control measures, site removals and clearing, earthwork, excavation, and grading, stormwater utilities, electrical service utilities and lighting, cast-in-place concrete foundations and footings, open-air shelter, playground & adven-ture course equipment on engineered wood fiber surfacing, site furnishings, as-phalt paving (pedestrian and vehicular), concrete paving, bean bag toss, trees, shrubs, low plant material, and native and turf seeding.
Bid Set - Drawings (click to expand/collapse)
Name Size
01_Plan Drawings 27.7 MB