Riverwalk Park Phase Three

This work includes: site preparation, construction fencing, temporary soil erosion and sediment control measures, site removals and clearing, earthwork, excava-tion, and grading; cast-in-place concrete, foundations, and footings; playground and challenge equipment installation, shade structure (alternate) installation, con-crete paving, tree, shrub, and perennial planting; turf seeding and turf sod installation. See the schedule of values for further detail.

Status

Accepting Bids

Bid Date 2/4/26 10:00am

Company & Contacts

Hitchcock Design Group
Doug Fair  
630-961-1787

Location

Winfield, Illinois 60190

Riverwalk Park Phase Three

The Village of Winfield does hereby invite sealed bids for Riverwalk Park Phase Three. Work will in-clude site clearing, earthwork operations, concrete curbs, walks and paving, site furnishings, playfield equipment installation, challenge course equipment installation, shade structure (alternate) installation, and planting and seeding. Project manuals, including bid form and specifications, and construction docu-ments are available after 10:00 AM on January 14, 2026, from Accurate Reprographics, www.hitchcockplanroom.com, 2368 Corporate Lane, Suite 100, Naperville, Illinois 60563, phone (630) 428-4433 for the non-refundable cost of reproduction.

Bids will be accepted at the Village of Winfield, 27 W 465 Jewell Road, Winfield, Illinois 60190, during regular office hours. All bids must be submitted in a sealed envelope marked with the Contractor’s name and address, and “Riverwalk Park Phase Three,” on the face of the envelope. Bids must be received no later than 10:00 AM on February 4, 2026. Bids will be opened at 10:01 AM on February 4, 2026, at Village Hall. All bidders will be required to submit Bid Security in the form of a Bid Bond, Certified Check, Cashier’s Check in the amount of 10% of the Base Bid, payable to the Village of Winfield.

The successful bidder, as determined by the Village of Winfield, shall be required to pay, and to agree to pay no less than the Prevailing Rate of Wages, pursuant to the Illinois Prevailing Wage Act (820 ILCS 130) for the locality of the Village of Winfield (DuPage County), to each laborer worker, or mechanic needed or used to complete the work as detailed in the contract to be let. The successful contractor, and all subcontractors shall be required to submit, to the Village of Winfield, certified payrolls no later than the tenth day of each calendar month for the immediately preceding month.

The Village of Winfield reserves the right to reject any and all proposals, parts of any and all proposals, or to waive technical errors or omissions in submitted proposals. No submitted bid may be withdrawn until a period of sixty (60) days after the bid opening date, without written consent of the Village of Win-field. The Village of Winfield encourages minority business firms to submit bids on this project and the successful contract bidder to utilize minority businesses as sub-contractors for supplies, equipment, ser-vices, and construction.

Questions should be directed to Doug Fair at dfair@hitchcockdesigngroup.com, Hitchcock Design Group at 630.961.1787.