Riverwalk Park Phase Three

This work includes: site preparation, construction fencing, temporary soil erosion and sediment control measures, site removals and clearing, earthwork, excava-tion, and grading; cast-in-place concrete, foundations, and footings; playground and challenge equipment installation, shade structure (alternate) installation, con-crete paving, tree, shrub, and perennial planting; turf seeding and turf sod installation. See the schedule of values for further detail.
Addendum No. 1 (click to expand/collapse)
Order files below for $0.00 each
Name Size
_addendum 01 20260122 riverwalk park 3.5 MB