Allen Park Final Design

This work includes: site preparation, construction fencing, temporary soil erosion sediment control measures, site removals and clearing, earthwork, excavation, and grading, stormwater utilities, electrical service utilities and lighting, cast-inplace concrete foundations and footings, open-air shelter, playground equipment on poured-in-place rubber play surfacing, site furnishings, asphalt paving, concrete paving, trees, shrubs, low plant material, and native and turf seeding. See Schedule of Values for further detail.
Addendum No. 1 (click to expand/collapse)
Order files below for $0.00 each
Name Size
add#1 20240307_Allen Park final design_combined 2.2 MB
Addendum No. 2 (click to expand/collapse)
Order files below for $0.00 each
Name Size
add#2 20240315_Allen Park final design_combined 1.8 MB
Addendum No. 3 (click to expand/collapse)
Order files below for $0.00 each
Name Size
add#3 20240318_Allen Park final design 147.0 KB