Allen Park Final Design
This work includes: site preparation, construction fencing, temporary soil erosion sediment control measures, site removals and clearing, earthwork, excavation, and grading, stormwater utilities, electrical service utilities and lighting, cast-inplace concrete foundations and footings, open-air shelter, playground equipment on poured-in-place rubber play surfacing, site furnishings, asphalt paving, concrete paving, trees, shrubs, low plant material, and native and turf seeding. See Schedule of Values for further detail.
Addendum No. 1
(click to expand/collapse)
Name | Size | |||
add#1 20240307_Allen Park final design_combined | 2.2 MB |
Addendum No. 2
(click to expand/collapse)
Name | Size | |||
add#2 20240315_Allen Park final design_combined | 1.8 MB |
Addendum No. 3
(click to expand/collapse)
Name | Size | |||
add#3 20240318_Allen Park final design | 147.0 KB |