Presidential Park Final Design
The Work is called Presidential Park and shall consist of Work will include removals, earthwork operations, open air shelter and restroom construction, concrete curbs, walks and paving, site furnishings, artificial turf athletic surfacing, poured in place play surfacing, engineered wood fiber play surfacing, playground equipment, fencing, masonry, planting and native seeding, utilities, and subdrainage
Addendum No. 1
(click to expand/collapse)
Name | Size | |||
_add1_presidential_20240301_combined | 353.0 KB |
Addendum No. 2
(click to expand/collapse)
Name | Size | |||
_add2_presidential_20240305 | 1.3 MB |