Townley Park

This work includes: site preparation, construction fencing, temporary soil erosion sediment control measures, site removals and clearing, earthwork, excavation, and grading, stormwater utilities, electrical service utilities and lighting, cast-inplace concrete foundations and footings, stone masonry, open-air shelter, playground equipment on pour-in-place rubber surfacing, site furnishings, asphalt paving (pedestrian and vehicular), color coat and striping, concrete paving, coated chain link fencing and gates, trees, shrubs, low plant material, and native and turf seeding. See Schedule of Values for further detail.
Addendum No. 1 (click to expand/collapse)
Order files below for $0.00 each
Name Size
_add#1 20240215_townley park final design 2.5 MB
Addendum No. 2 (click to expand/collapse)
Order files below for $0.00 each
Name Size
_add#2 20240223_townley park final design 8.1 MB
Addendum No. 3 (click to expand/collapse)
Order files below for $0.00 each
Name Size
_add#3 20240304_townley park final design 396.7 KB