Blackstone Park Final Design

This work includes: site preparation, construction fencing, temporary soil erosion and sediment control measures, site removals and clearing, earthwork, excavation, and grading; storm sewer utilities, cast-in-place concrete foundations and footings, playground and fitness equipment, picnic shelter, site furnishings, interpretive signage, asphalt paving, concrete paving and barrier curb, native planting, and turf seeding.
Bid Set - Drawings (click to expand/collapse)