Terrace View Playground Renovation
Work will include Work will include site clearing, temporary soil erosion and sediment control measures/maintenance, earthwork, storm sewer, asphalt patching, concrete paving, curbs and footings, playground installation, poured-in-place rubber play surfacing, stone masonry, turf grass seeding, and landscaping.
Bid Set - Drawings
(click to expand/collapse)

Name | Size | ||
plans_20231010_Terrace View Park_IFB | 53.4 MB |