Pleasant Hill Park
Work will include signage, playground equipment installation, basketball hoop and post installation, site furnishing installation, temporary soil erosion and sediment control, site preparation and removals, earthwork, asphalt paving, pavement markings, concrete paving and curbs, playground ramps, play surfacing (engineered wood fiber), landscape block retaining wall resetting, turf grass seeding, plants, and storm utility drainage piping.
Addendum No. 1
(click to expand/collapse)

Name | Size | |||
20250515_Pleasant Hill Park Final Design_Addendum #1 | 1.5 MB |
Bid Tabulation
(click to expand/collapse)

Name | Size | |||
20250521_Pleasant Hill Park Final Design_Bid Tabulation_Scan | 732.5 KB |