Ivanhoe Park

Work will include temporary soil erosion and sediment control, earthwork, drainage, asphalt paving for walking paths, concrete paving for walks, curbs, and footings, and the installation of: playground equipment; activity obstacles; picnic shelter; gaga ball pit; site furnishings; play surfacing - engineered wood fiber, artificial turf; native plantings and educational signage; turf grass seeding; and landscaping.
Addendum No. 1 (click to expand/collapse)
Order files below for $0.00 each
Name Size
_add #1 20250425 ivanhoe park 1.6 MB