Jubilee Point Park Phase II

The proposed work consists of furnishing all necessary labor, materials, and equipment for site preparation, construction fencing, temporary soil erosion sediment control measures, site removals and clearing, earthwork, excavation and grading, stormwater utilities, electrical service utilities and lighting, water service utilities and hose bibs, asphalt paving (pedestrian and vehicular), concrete paving (pedestrian and vehicular), concrete curb and gutter, playground with pour-in-place rubber surfacing, concrete playground curbing, cast-in-place concrete foundations and footings, installation of an open-air shelter with stone masonry column wraps, seatwall masonry, wood fence enclosure for portable restrooms, ornamental wood fencing for garden plot area, boardwalk with concrete abutments, outdoor ping pong tables, bag toss boards, MUSA futsal court, pickleball courts with chain link fencing and swing gates, sport court paving and striping, furnishing and planting of specified trees, shrubs, low plant material, native seed mixture, and turf seed and blanket as specified and in compliance with all applicable laws and codes at Jubilee Point Park located at 7101 Woodridge Dr., Woodridge, Illinois.
Addendum No. 1 (click to expand/collapse)
Order files below for $0.00 each
Name Size
_add#1 20241121_jubilee point park final design 58.9 MB
Addendum No. 2 (click to expand/collapse)
Addendum No. 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Order files below for $0.00 each
Name Size
_add#3 20241203_jubilee point park final design 1.1 MB