Work will include: site clearing, earthwork operations, water main and appurte-nances, storm sewage, asphalt paving, concrete curbs, walks and paving, site fur-nishings, playfield equipment, planting and seeding, stone masonry, and lighting installation.

Status

Bidding Closed

Bid Date4/19/23 10:00am

Company & Contacts

Hitchcock Design Group
Bridget Deatrick or Eric Hornig  
(630) 961-1787

Location

5N598 Mill Road, Wood Dale, Illinois 60191

Benson Park
The Itasca Park District does hereby invite sealed bids for Benson Park. Work will include site clearing,
earthwork operations, water main and appurtenances, storm sewerage, asphalt paving, concrete curbs,
walks and paving, site furnishings, playfield equipment, planting and seeding, stone masonry, and lighting
installation.
Project manuals, including bid form and specifications, and construction documents are available after
10:00 AM on March 29, 2023 from Accurate Reprographics 2368 Corporate Lane, Suite 100, Naperville,
Illinois 60563, 630.428.4433 www.hitchcockplanroom.com. Bidding documents are available to
download and print at the non-refundable cost of reproduction.
Bids will be accepted at the Itasca Park District 3502 East Irving Park Road, Itasca, Illinois 60143, during
regular office hours. All bids must be submitted in a sealed envelope marked with the Contractor’s name
and address, and “Bid for Benson Park,” on the face of the envelope. Bids must be received no later than
10:00 AM on April 19, 2023. Bids will be opened at 10:01 AM on April 19, 2023 at the Itasca Park District
350 East Irving Park Road, Itasca, Illinois 60143. All bidders will be required to submit Bid Security
in the form of a Bid Bond in the amount of 10% of the Base Bid, payable to the Itasca Park District.
The successful bidder, as determined by the Itasca Park District, shall be required to pay, and to agree to
pay no less than the Prevailing Rate of Wages, pursuant to the Illinois Prevailing Wage Act (820 ILCS
130) for the locality of the Itasca Park District (DuPage County), to each laborer worker, or mechanic
needed or used to complete the work as detailed in the contract to be let. The successful contractor, and
all subcontractors shall be required to submit, to the Itasca Park District Itasca Park District, certified payrolls